US Bridges

Cygnet Road over S. Br Port Rvr Cygnet RD

Good

Wood County, Ohio · 0.1 MI East of Emerson RD · Structure no. 8731102

Built
2017
8 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
92 ft
2 main spans
Daily traffic
411
2015 count
Owner
County
County Highway Agency

About this bridge

Cygnet Road over S. Br Port Rvr Cygnet RD is a prestressed concrete box beam or girders - multiple carrying Cygnet Road over S. Br Port Rvr Cygnet RD in Wood County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 411 vehicles a day, roughly 8% of them trucks, projected to reach 570 by 2035. The structure is 92 ft (28 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCygnet Road
CrossesS. Br Port Rvr Cygnet RD
Location0.1 MI East of Emerson RD
RouteCounty Highway C003G
StateOhio
Coordinates41.2384, -83.53423
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating101.4 US tons
Inventory rating60.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length92 ft (28 m)
Longest span44 ft (13.4 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic411 (2015)
Projected traffic570 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$306 million
NavigationNo navigation control on waterway

Frequently asked questions

When was Cygnet Road over S. Br Port Rvr Cygnet RD built?

It was built in 2017, making it 8 years old in 2025.

What condition is Cygnet Road over S. Br Port Rvr Cygnet RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Cygnet Road over S. Br Port Rvr Cygnet RD carry?

About 411 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is Cygnet Road over S. Br Port Rvr Cygnet RD?

The structure is 92 ft (28 m) long with a longest span of 44 ft (13.4 m) and a deck 28 ft wide.

Who owns Cygnet Road over S. Br Port Rvr Cygnet RD?

It is owned by the County Highway Agency.