US Bridges

SR 295 over Maumee River

Fair

Wood County, Ohio · 0.02 Mi. North of SR 65 · Structure no. 8706840

Built
1964
61 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
650 ft
4 main spans
Daily traffic
5,316
2019 count
Owner
State
State Highway Agency

About this bridge

SR 295 over Maumee River is a steel continuous stringer/multi-beam or girder carrying SR 295 over Maumee River in Wood County, Ohio. It was built in 1964, so it is 61 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,316 vehicles a day, roughly 11% of them trucks, projected to reach 6,768 by 2039. The structure is 650 ft (198.1 m) long and 40 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesSR 295
CrossesMaumee River
Location0.02 Mi. North of SR 65
RouteState Highway 295
StateOhio
Coordinates41.41341, -83.86106
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating30.3 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length650 ft (198.1 m)
Longest span184 ft (56.1 m)
Deck width40 ft (12.1 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,316 (2019)
Projected traffic6,768 by 2039
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 295 over Maumee River built?

It was built in 1964, making it 61 years old in 2025.

What condition is SR 295 over Maumee River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does SR 295 over Maumee River carry?

About 5,316 vehicles per day (2019 count), of which roughly 11% are trucks.

How long is SR 295 over Maumee River?

The structure is 650 ft (198.1 m) long with a longest span of 184 ft (56.1 m) and a deck 40 ft wide.

Who owns SR 295 over Maumee River?

It is owned by the State Highway Agency.