US Bridges

I75 NB Ramp to I80 over I80 Ohio Tpk

Good

Wood County, Ohio · I75 at Ohio Turnpike · Structure no. 8704562

Built
1991
34 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
275 ft
4 main spans
Daily traffic
2,920
1990 count
Owner
State
State Highway Agency

About this bridge

I75 NB Ramp to I80 over I80 Ohio Tpk is a steel continuous stringer/multi-beam or girder carrying I75 NB Ramp to I80 over I80 Ohio Tpk in Wood County, Ohio. It was built in 1991, so it is 34 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,920 vehicles a day, roughly 20% of them trucks, projected to reach 4,053 by 2010. The structure is 275 ft (83.8 m) long and 31 ft wide.

CarriesI75 NB Ramp to I80
CrossesI80 Ohio Tpk
LocationI75 at Ohio Turnpike
RouteInterstate 75
StateOhio
Coordinates41.56873, -83.58102
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.2 US tons
Inventory rating48.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length275 ft (83.8 m)
Longest span74 ft (22.6 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,920 (1990)
Projected traffic4,053 by 2010
Trucks20%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I75 NB Ramp to I80 over I80 Ohio Tpk built?

It was built in 1991, making it 34 years old in 2025.

What condition is I75 NB Ramp to I80 over I80 Ohio Tpk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does I75 NB Ramp to I80 over I80 Ohio Tpk carry?

About 2,920 vehicles per day (1990 count), of which roughly 20% are trucks.

How long is I75 NB Ramp to I80 over I80 Ohio Tpk?

The structure is 275 ft (83.8 m) long with a longest span of 74 ft (22.6 m) and a deck 31 ft wide.

Who owns I75 NB Ramp to I80 over I80 Ohio Tpk?

It is owned by the State Highway Agency.