US Bridges

SR 25 over North Br. Portage River

Good

Wood County, Ohio · .5 MI S. of Portage RD · Structure no. 8701792

Built
2003
22 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
91 ft
3 main spans
Daily traffic
7,704
2015 count
Owner
State
State Highway Agency

About this bridge

SR 25 over North Br. Portage River is a prestressed concrete continuous box beam or girders - multiple carrying SR 25 over North Br. Portage River in Wood County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,704 vehicles a day, roughly 11% of them trucks, projected to reach 10,693 by 2035. The structure is 91 ft (27.7 m) long and 82 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 25
CrossesNorth Br. Portage River
Location.5 MI S. of Portage RD
RouteState Highway 25
StateOhio
Coordinates41.32144, -83.65041
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating68.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length91 ft (27.7 m)
Longest span34 ft (10.4 m)
Deck width82 ft (25 m)
Roadway width82 ft (25 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,704 (2015)
Projected traffic10,693 by 2035
Trucks11%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 25 over North Br. Portage River built?

It was built in 2003, making it 22 years old in 2025.

What condition is SR 25 over North Br. Portage River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 25 over North Br. Portage River carry?

About 7,704 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is SR 25 over North Br. Portage River?

The structure is 91 ft (27.7 m) long with a longest span of 34 ft (10.4 m) and a deck 82 ft wide.

Who owns SR 25 over North Br. Portage River?

It is owned by the State Highway Agency.