US Bridges

TR 8/M over Eagle Creek

Good

Williams County, Ohio · 08370 RD 8/M · Structure no. 8631949

Built
2023
2 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
25
2022 count
Owner
County
County Highway Agency

About this bridge

TR 8/M over Eagle Creek is a prestressed concrete box beam or girders - single or spread carrying TR 8/M over Eagle Creek in Williams County, Ohio. It was built in 2023, so it is 2 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 1% of them trucks, projected to reach 33 by 2032. The structure is 70 ft (21.3 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 8/M
CrossesEagle Creek
Location08370 RD 8/M
RouteCounty Highway T0017
StateOhio
Coordinates41.60707, -84.66262
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating51.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span70 ft (21.3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2022)
Projected traffic33 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$650.8 million
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 8/M over Eagle Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is TR 8/M over Eagle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does TR 8/M over Eagle Creek carry?

About 25 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is TR 8/M over Eagle Creek?

The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 28 ft wide.

Who owns TR 8/M over Eagle Creek?

It is owned by the County Highway Agency.