US Bridges

Industrial Street over Trib to Chippewa Creek

Good

Wayne County, Ohio · 0.270 MI N of E Ohio Ave · Structure no. 8560060

Built
1996
29 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
38 ft
1 main span
Daily traffic
377
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Industrial Street over Trib to Chippewa Creek is a prestressed concrete box beam or girders - multiple carrying Industrial Street over Trib to Chippewa Creek in Wayne County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 377 vehicles a day, roughly 2% of them trucks, projected to reach 600 by 2041. The structure is 38 ft (11.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIndustrial Street
CrossesTrib to Chippewa Creek
Location0.270 MI N of E Ohio Ave
RouteCity Street 454
StateOhio
Coordinates40.97697, -81.77545
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length38 ft (11.6 m)
Longest span36 ft (11 m)
Deck width42 ft (12.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic377 (2021)
Projected traffic600 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Industrial Street over Trib to Chippewa Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is Industrial Street over Trib to Chippewa Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Industrial Street over Trib to Chippewa Creek carry?

About 377 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Industrial Street over Trib to Chippewa Creek?

The structure is 38 ft (11.6 m) long with a longest span of 36 ft (11 m) and a deck 42 ft wide.

Who owns Industrial Street over Trib to Chippewa Creek?

It is owned by the City or Municipal Highway Agency.