Twp. Road 129 over Sugar Creek
GoodWayne County, Ohio · 0.6 Mile North of US30 · Structure no. 8554943
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 78 ft
- 1 main span
- Daily traffic
- 691
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Twp. Road 129 over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying Twp. Road 129 over Sugar Creek in Wayne County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 691 vehicles a day, roughly 7% of them trucks, projected to reach 959 by 2038. The structure is 78 ft (23.8 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Twp. Road 129 over Sugar Creek built?
It was built in 2015, making it 10 years old in 2025.
What condition is Twp. Road 129 over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Twp. Road 129 over Sugar Creek carry?
About 691 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is Twp. Road 129 over Sugar Creek?
The structure is 78 ft (23.8 m) long with a longest span of 75 ft (22.8 m) and a deck 29 ft wide.
Who owns Twp. Road 129 over Sugar Creek?
It is owned by the County Highway Agency.