Milton St. over Sugar Creek
PoorPosted for loadWayne County, Ohio · 0.1 Mi. S. of SR585 · Structure no. 8545359
- Built
- 1970
- 55 years old
- Condition
- Poor
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 1,030
- 2008 count
- Owner
- County
- County Highway Agency
About this bridge
Milton St. over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying Milton St. over Sugar Creek in Wayne County, Ohio. It was built in 1970, so it is 55 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 1,030 vehicles a day, roughly 3% of them trucks, projected to reach 1,430 by 2028. The structure is 46 ft (14 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Milton St. over Sugar Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is Milton St. over Sugar Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does Milton St. over Sugar Creek carry?
About 1,030 vehicles per day (2008 count), of which roughly 3% are trucks.
How long is Milton St. over Sugar Creek?
The structure is 46 ft (14 m) long with a longest span of 44 ft (13.4 m) and a deck 50 ft wide.
Who owns Milton St. over Sugar Creek?
It is owned by the County Highway Agency.