US Bridges

Twp. Road 124 over Cedar Valley Run

Good

Wayne County, Ohio · 150 Feet North of CR22 · Structure no. 8534578

Built
2014
11 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
32 ft
1 main span
Daily traffic
166
2015 count
Owner
County
County Highway Agency

About this bridge

Twp. Road 124 over Cedar Valley Run is a concrete slab carrying Twp. Road 124 over Cedar Valley Run in Wayne County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 166 vehicles a day, roughly 7% of them trucks, projected to reach 230 by 2035. The structure is 32 ft (9.9 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTwp. Road 124
CrossesCedar Valley Run
Location150 Feet North of CR22
RouteCounty Highway T0124
StateOhio
Coordinates40.87237, -82.02403
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating50 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length32 ft (9.9 m)
Longest span30 ft (9 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic166 (2015)
Projected traffic230 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Twp. Road 124 over Cedar Valley Run built?

It was built in 2014, making it 11 years old in 2025.

What condition is Twp. Road 124 over Cedar Valley Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Twp. Road 124 over Cedar Valley Run carry?

About 166 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Twp. Road 124 over Cedar Valley Run?

The structure is 32 ft (9.9 m) long with a longest span of 30 ft (9 m) and a deck 24 ft wide.

Who owns Twp. Road 124 over Cedar Valley Run?

It is owned by the County Highway Agency.