Twp. Road 64 over Branch of Chippewa Creek
GoodWayne County, Ohio · 0.2 Mi. South of SR604 · Structure no. 8532419
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 195
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Twp. Road 64 over Branch of Chippewa Creek is a prestressed concrete box beam or girders - multiple carrying Twp. Road 64 over Branch of Chippewa Creek in Wayne County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 195 vehicles a day, roughly 8% of them trucks, projected to reach 271 by 2035. The structure is 67 ft (20.5 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Twp. Road 64 over Branch of Chippewa Creek built?
It was built in 2001, making it 24 years old in 2025.
What condition is Twp. Road 64 over Branch of Chippewa Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Twp. Road 64 over Branch of Chippewa Creek carry?
About 195 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Twp. Road 64 over Branch of Chippewa Creek?
The structure is 67 ft (20.5 m) long with a longest span of 66 ft (20.1 m) and a deck 28 ft wide.
Who owns Twp. Road 64 over Branch of Chippewa Creek?
It is owned by the County Highway Agency.