TR 459 over Halfway Run * Anderson W
GoodWashington County, Ohio · 0.38MI NW CR126 · Structure no. 8436630
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 324
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
TR 459 over Halfway Run * Anderson W is a prestressed concrete box beam or girders - multiple carrying TR 459 over Halfway Run * Anderson W in Washington County, Ohio. It was built in 2009, so it is 16 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 324 vehicles a day, roughly 7% of them trucks, projected to reach 450 by 2035. The structure is 45 ft (13.8 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 459 over Halfway Run * Anderson W built?
It was built in 2009, making it 16 years old in 2025.
What condition is TR 459 over Halfway Run * Anderson W in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does TR 459 over Halfway Run * Anderson W carry?
About 324 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is TR 459 over Halfway Run * Anderson W?
The structure is 45 ft (13.8 m) long with a longest span of 41 ft (12.4 m) and a deck 21 ft wide.
Who owns TR 459 over Halfway Run * Anderson W?
It is owned by the County Highway Agency.