Township Road 75 over Duck Creek * Steven
GoodWashington County, Ohio · .01 MI E of JCT SR 821 · Structure no. 8435015
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 80 ft
- 1 main span
- Daily traffic
- 20
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Township Road 75 over Duck Creek * Steven is a steel stringer/multi-beam or girder carrying Township Road 75 over Duck Creek * Steven in Washington County, Ohio. It was built in 2024, so it is 1 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20 vehicles a day, roughly 50% of them trucks, projected to reach 20 by 2053. The structure is 80 ft (24.4 m) long and 16 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Township Road 75 over Duck Creek * Steven built?
It was built in 2024, making it 1 years old in 2025.
What condition is Township Road 75 over Duck Creek * Steven in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Township Road 75 over Duck Creek * Steven carry?
About 20 vehicles per day (2023 count), of which roughly 50% are trucks.
How long is Township Road 75 over Duck Creek * Steven?
The structure is 80 ft (24.4 m) long with a longest span of 76 ft (23.3 m) and a deck 16 ft wide.
Who owns Township Road 75 over Duck Creek * Steven?
It is owned by the County Highway Agency.