Township Road 19 over Cow Run * Peavy#
FairPosted for loadWashington County, Ohio · 2.02 MI E of JCT SR 26 · Structure no. 8433704
- Built
- 1914
- 111 years old, rebuilt 2004
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 18
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Township Road 19 over Cow Run * Peavy# is a steel stringer/multi-beam or girder carrying Township Road 19 over Cow Run * Peavy# in Washington County, Ohio. It was built in 1914 and reconstructed in 2004, so it is 111 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 18 vehicles a day, roughly 11% of them trucks, projected to reach 25 by 2035. The structure is 31 ft (9.4 m) long and 15 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Township Road 19 over Cow Run * Peavy# built?
It was built in 1914, making it 111 years old in 2025. It was reconstructed in 2004.
What condition is Township Road 19 over Cow Run * Peavy# in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Township Road 19 over Cow Run * Peavy# carry?
About 18 vehicles per day (2015 count), of which roughly 11% are trucks.
How long is Township Road 19 over Cow Run * Peavy#?
The structure is 31 ft (9.4 m) long with a longest span of 27 ft (8.2 m) and a deck 15 ft wide.
Who owns Township Road 19 over Cow Run * Peavy#?
It is owned by the County Highway Agency.