Township Road 404 over Wilson Run * Lis
GoodPosted for loadWashington County, Ohio · .05 MI S of JCT Twp 136 · Structure no. 8432988
- Built
- 1960
- 65 years old, rebuilt 2004
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 36 ft
- 2 main spans
- Daily traffic
- 96
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Township Road 404 over Wilson Run * Lis is a steel continuous stringer/multi-beam or girder carrying Township Road 404 over Wilson Run * Lis in Washington County, Ohio. It was built in 1960 and reconstructed in 2004, so it is 65 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 96 vehicles a day, roughly 7% of them trucks, projected to reach 133 by 2035. The structure is 36 ft (10.9 m) long and 12 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Township Road 404 over Wilson Run * Lis built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2004.
What condition is Township Road 404 over Wilson Run * Lis in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Township Road 404 over Wilson Run * Lis carry?
About 96 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Township Road 404 over Wilson Run * Lis?
The structure is 36 ft (10.9 m) long with a longest span of 19 ft (5.8 m) and a deck 12 ft wide.
Who owns Township Road 404 over Wilson Run * Lis?
It is owned by the County Highway Agency.