SR 821 over West Fork of Duck Creek
FairWashington County, Ohio · 0.5 MI S. of JCT SR 530 · Structure no. 8405522
- Built
- 1924
- 101 years old, rebuilt 1989
- Condition
- Fair
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 250 ft
- 5 main spans
- Daily traffic
- 510
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 821 over West Fork of Duck Creek is a prestressed concrete box beam or girders - multiple carrying SR 821 over West Fork of Duck Creek in Washington County, Ohio. It was built in 1924 and reconstructed in 1989, so it is 101 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 510 vehicles a day, roughly 9% of them trucks, projected to reach 708 by 2035. The structure is 250 ft (76.3 m) long and 28 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 821 over West Fork of Duck Creek built?
It was built in 1924, making it 101 years old in 2025. It was reconstructed in 1989.
What condition is SR 821 over West Fork of Duck Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does SR 821 over West Fork of Duck Creek carry?
About 510 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is SR 821 over West Fork of Duck Creek?
The structure is 250 ft (76.3 m) long with a longest span of 78 ft (23.9 m) and a deck 28 ft wide.
Who owns SR 821 over West Fork of Duck Creek?
It is owned by the State Highway Agency.