US Bridges

SR 60 over Olive Green Creek

Good

Washington County, Ohio · 0.75M S Morgan Co. Line · Structure no. 8402884

Built
1932
93 years old, rebuilt 1989
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
156 ft
2 main spans
Daily traffic
3,888
2015 count
Owner
State
State Highway Agency

About this bridge

SR 60 over Olive Green Creek is a steel continuous stringer/multi-beam or girder carrying SR 60 over Olive Green Creek in Washington County, Ohio. It was built in 1932 and reconstructed in 1989, so it is 93 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,888 vehicles a day, roughly 8% of them trucks, projected to reach 5,397 by 2035. The structure is 156 ft (47.5 m) long and 32 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 60
CrossesOlive Green Creek
Location0.75M S Morgan Co. Line
RouteState Highway 60
StateOhio
Coordinates39.58081, -81.66746
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.1 US tons
Inventory rating28.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length156 ft (47.5 m)
Longest span75 ft (23 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,888 (2015)
Projected traffic5,397 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 60 over Olive Green Creek built?

It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1989.

What condition is SR 60 over Olive Green Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 60 over Olive Green Creek carry?

About 3,888 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is SR 60 over Olive Green Creek?

The structure is 156 ft (47.5 m) long with a longest span of 75 ft (23 m) and a deck 32 ft wide.

Who owns SR 60 over Olive Green Creek?

It is owned by the State Highway Agency.