SR 7 over Musk.R.Front&gilman St.
GoodWashington County, Ohio · 1.12M N of JCT SR 550 · Structure no. 8402108
- Built
- 1953
- 72 years old, rebuilt 2009
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,037 ft
- 7 main spans
- Daily traffic
- 10,799
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 7 over Musk.R.Front&gilman St. is a steel continuous stringer/multi-beam or girder carrying SR 7 over Musk.R.Front&gilman St. in Washington County, Ohio. It was built in 1953 and reconstructed in 2009, so it is 72 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,799 vehicles a day, roughly 11% of them trucks, projected to reach 14,989 by 2035. The structure is 1,037 ft (316 m) long and 38 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 7 over Musk.R.Front&gilman St. built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 2009.
What condition is SR 7 over Musk.R.Front&gilman St. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SR 7 over Musk.R.Front&gilman St. carry?
About 10,799 vehicles per day (2015 count), of which roughly 11% are trucks.
How long is SR 7 over Musk.R.Front&gilman St.?
The structure is 1,037 ft (316 m) long with a longest span of 135 ft (41.1 m) and a deck 38 ft wide.
Who owns SR 7 over Musk.R.Front&gilman St.?
It is owned by the State Highway Agency.