Innovation Way over Union Run Stream
FairWarren County, Ohio · 0.3 MI S of Western Row · Structure no. 8362238
- Built
- 1985
- 40 years old, rebuilt 2019
- Condition
- Fair
- inspected May 2024
- Type
- Culvert
- Steel
- Length
- 25 ft
- 2 main spans
- Daily traffic
- 200
- 2025 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Innovation Way over Union Run Stream is a steel culvert carrying Innovation Way over Union Run Stream in Warren County, Ohio. It was built in 1985 and reconstructed in 2019, so it is 40 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 278 by 2045. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Innovation Way over Union Run Stream built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2019.
What condition is Innovation Way over Union Run Stream in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Innovation Way over Union Run Stream carry?
About 200 vehicles per day (2025 count), of which roughly 5% are trucks.
How long is Innovation Way over Union Run Stream?
The structure is 25 ft (7.6 m) long with a longest span of 11 ft (3.5 m).
Who owns Innovation Way over Union Run Stream?
It is owned by the City or Municipal Highway Agency.