US Bridges

Roachester-Osceola over Sugar Run

FairPosted for load

Warren County, Ohio · 0.58 MI W of SR 132 · Structure no. 8335079

Built
1988
37 years old
Condition
Fair
inspected December 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
69 ft
1 main span
Daily traffic
264
2015 count
Owner
County
County Highway Agency

About this bridge

Roachester-Osceola over Sugar Run is a prestressed concrete box beam or girders - multiple carrying Roachester-Osceola over Sugar Run in Warren County, Ohio. It was built in 1988, so it is 37 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 264 vehicles a day, roughly 8% of them trucks, projected to reach 366 by 2035. The structure is 69 ft (21 m) long and 20 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesRoachester-Osceola
CrossesSugar Run
Location0.58 MI W of SR 132
RouteCounty Highway C0200
StateOhio
Coordinates39.34482, -84.06768
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating25.7 US tons
Inventory rating8.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length69 ft (21 m)
Longest span66 ft (20.1 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic264 (2015)
Projected traffic366 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Roachester-Osceola over Sugar Run built?

It was built in 1988, making it 37 years old in 2025.

What condition is Roachester-Osceola over Sugar Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Roachester-Osceola over Sugar Run carry?

About 264 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is Roachester-Osceola over Sugar Run?

The structure is 69 ft (21 m) long with a longest span of 66 ft (20.1 m) and a deck 20 ft wide.

Who owns Roachester-Osceola over Sugar Run?

It is owned by the County Highway Agency.