US Bridges

Stokes Reserve Ct. over Clear Creek

FairPosted for load

Warren County, Ohio · 0.24 MI E of SR 48 · Structure no. 8332371

Built
2001
24 years old
Condition
Fair
inspected October 2024
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
25 ft
1 main span
Daily traffic
1,949
2015 count
Owner
County
County Highway Agency

About this bridge

Stokes Reserve Ct. over Clear Creek is a aluminum, wrought iron, or cast iron culvert carrying Stokes Reserve Ct. over Clear Creek in Warren County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,949 vehicles a day, roughly 5% of them trucks, projected to reach 2,705 by 2035. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 123.7 mi (199 km).

CarriesStokes Reserve Ct.
CrossesClear Creek
Location0.24 MI E of SR 48
RouteCounty Highway T0401
StateOhio
Coordinates39.51729, -84.18098
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating25 US tons
Inventory rating21.4 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,949 (2015)
Projected traffic2,705 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stokes Reserve Ct. over Clear Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is Stokes Reserve Ct. over Clear Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Stokes Reserve Ct. over Clear Creek carry?

About 1,949 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Stokes Reserve Ct. over Clear Creek?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m).

Who owns Stokes Reserve Ct. over Clear Creek?

It is owned by the County Highway Agency.