Oregonia Road over Branch of Turtle Creek
FairWarren County, Ohio · 0.43 MI S of TR 95 · Structure no. 8330042
- Built
- 1970
- 55 years old, rebuilt 2012
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 1,132
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Oregonia Road over Branch of Turtle Creek is a steel stringer/multi-beam or girder carrying Oregonia Road over Branch of Turtle Creek in Warren County, Ohio. It was built in 1970 and reconstructed in 2012, so it is 55 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,132 vehicles a day, roughly 8% of them trucks, projected to reach 1,571 by 2035. The structure is 32 ft (9.8 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Oregonia Road over Branch of Turtle Creek built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2012.
What condition is Oregonia Road over Branch of Turtle Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Oregonia Road over Branch of Turtle Creek carry?
About 1,132 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Oregonia Road over Branch of Turtle Creek?
The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m) and a deck 25 ft wide.
Who owns Oregonia Road over Branch of Turtle Creek?
It is owned by the County Highway Agency.