US Bridges

Hendrickson RD C80 over I75

Good

Warren County, Ohio · .8 MI S of SR 122 · Structure no. 8303339

Built
1960
65 years old, rebuilt 2008
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
281 ft
4 main spans
Daily traffic
1,949
2015 count
Owner
State
State Highway Agency

About this bridge

Hendrickson RD C80 over I75 is a steel continuous stringer/multi-beam or girder carrying Hendrickson RD C80 over I75 in Warren County, Ohio. It was built in 1960 and reconstructed in 2008, so it is 65 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,949 vehicles a day, roughly 5% of them trucks, projected to reach 142,904 by 2035. The structure is 281 ft (85.6 m) long and 31 ft wide.

CarriesHendrickson RD C80
CrossesI75
Location.8 MI S of SR 122
RouteCounty Highway C0080
StateOhio
Coordinates39.48024, -84.32521
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating39.2 US tons
Inventory rating28.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length281 ft (85.6 m)
Longest span81 ft (24.8 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,949 (2015)
Projected traffic142,904 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Hendrickson RD C80 over I75 built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2008.

What condition is Hendrickson RD C80 over I75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Hendrickson RD C80 over I75 carry?

About 1,949 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Hendrickson RD C80 over I75?

The structure is 281 ft (85.6 m) long with a longest span of 81 ft (24.8 m) and a deck 31 ft wide.

Who owns Hendrickson RD C80 over I75?

It is owned by the State Highway Agency.