IR71 over Acc Dr;lit Miami R;bkway
GoodWarren County, Ohio · 2.5 MI N of JCT SR 123 · Structure no. 8302294
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected October 2024
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 2,252 ft
- 6 main spans
- Daily traffic
- 22,075
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IR71 over Acc Dr;lit Miami R;bkway is a prestressed concrete continuous segmental box girder carrying IR71 over Acc Dr;lit Miami R;bkway in Warren County, Ohio. It was built in 2016, so it is 9 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,075 vehicles a day, roughly 11% of them trucks. The structure is 2,252 ft (686.5 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IR71 over Acc Dr;lit Miami R;bkway built?
It was built in 2016, making it 9 years old in 2025.
What condition is IR71 over Acc Dr;lit Miami R;bkway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does IR71 over Acc Dr;lit Miami R;bkway carry?
About 22,075 vehicles per day (2015 count), of which roughly 11% are trucks.
How long is IR71 over Acc Dr;lit Miami R;bkway?
The structure is 2,252 ft (686.5 m) long with a longest span of 440 ft (134.1 m) and a deck 55 ft wide.
Who owns IR71 over Acc Dr;lit Miami R;bkway?
It is owned by the State Highway Agency.