Reserve Avenue SW over Haliday Street & CSX RR
FairTrumbull County, Ohio · .12 MI So of War 07 Brdge · Structure no. 7860013
- Built
- 1975
- 50 years old, rebuilt 2023
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 362 ft
- 6 main spans
- Daily traffic
- 2,349
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Reserve Avenue SW over Haliday Street & CSX RR is a steel continuous stringer/multi-beam or girder carrying Reserve Avenue SW over Haliday Street & CSX RR in Trumbull County, Ohio. It was built in 1975 and reconstructed in 2023, so it is 50 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,349 vehicles a day, roughly 5% of them trucks, projected to reach 3,260 by 2007. The structure is 362 ft (110.2 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Reserve Avenue SW over Haliday Street & CSX RR built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2023.
What condition is Reserve Avenue SW over Haliday Street & CSX RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Reserve Avenue SW over Haliday Street & CSX RR carry?
About 2,349 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Reserve Avenue SW over Haliday Street & CSX RR?
The structure is 362 ft (110.2 m) long with a longest span of 74 ft (22.6 m) and a deck 38 ft wide.
Who owns Reserve Avenue SW over Haliday Street & CSX RR?
It is owned by the City or Municipal Highway Agency.