Burnett-East RD over Sugar Creek
GoodTrumbull County, Ohio · 0.3 MI West SR5 · Structure no. 7844892
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 81 ft
- 1 main span
- Daily traffic
- 414
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Burnett-East RD over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying Burnett-East RD over Sugar Creek in Trumbull County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 414 vehicles a day, roughly 3% of them trucks, projected to reach 497 by 2037. The structure is 81 ft (24.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Burnett-East RD over Sugar Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is Burnett-East RD over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Burnett-East RD over Sugar Creek carry?
About 414 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Burnett-East RD over Sugar Creek?
The structure is 81 ft (24.7 m) long with a longest span of 79 ft (24.1 m) and a deck 30 ft wide.
Who owns Burnett-East RD over Sugar Creek?
It is owned by the County Highway Agency.