US Bridges

T222B over Mud Run

Good

Trumbull County, Ohio · 0.7 Mi. East CH217 · Structure no. 7844434

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
490
2015 count
Owner
County
County Highway Agency

About this bridge

T222B over Mud Run is a prestressed concrete box beam or girders - multiple carrying T222B over Mud Run in Trumbull County, Ohio. It was built in 2024, so it is 1 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 490 vehicles a day, projected to reach 500 by 2041. The structure is 51 ft (15.5 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT222B
CrossesMud Run
Location0.7 Mi. East CH217
RouteCounty Highway T222B
StateOhio
Coordinates41.35995, -80.91875
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating44.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length51 ft (15.5 m)
Longest span49 ft (14.9 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic490 (2015)
Projected traffic500 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$477,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was T222B over Mud Run built?

It was built in 2024, making it 1 years old in 2025.

What condition is T222B over Mud Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does T222B over Mud Run carry?

About 490 vehicles per day (2015 count).

How long is T222B over Mud Run?

The structure is 51 ft (15.5 m) long with a longest span of 49 ft (14.9 m) and a deck 24 ft wide.

Who owns T222B over Mud Run?

It is owned by the County Highway Agency.