US Bridges

Corey Hunt Road over Center Creek

Good

Trumbull County, Ohio · 100 Feet North of SR 88 · Structure no. 7843909

Built
2001
24 years old
Condition
Good
inspected April 2023
Type
Frame
Concrete
Length
30 ft
1 main span
Daily traffic
209
2015 count
Owner
County
County Highway Agency

About this bridge

Corey Hunt Road over Center Creek is a concrete frame carrying Corey Hunt Road over Center Creek in Trumbull County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 209 vehicles a day, roughly 7% of them trucks, projected to reach 290 by 2035. The structure is 30 ft (9.1 m) long and 40 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCorey Hunt Road
CrossesCenter Creek
Location100 Feet North of SR 88
RouteCounty Highway 233
StateOhio
Coordinates41.39028, -80.89278
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45 US tons
Inventory rating30 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length30 ft (9.1 m)
Longest span29 ft (8.8 m)
Deck width40 ft (12.3 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic209 (2015)
Projected traffic290 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Corey Hunt Road over Center Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is Corey Hunt Road over Center Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Corey Hunt Road over Center Creek carry?

About 209 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Corey Hunt Road over Center Creek?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m) and a deck 40 ft wide.

Who owns Corey Hunt Road over Center Creek?

It is owned by the County Highway Agency.