US Bridges

EB Tpk Exit 216 Rp over I-80 Ohio Turnpike

Fair

Trumbull County, Ohio · EB on Ramp Oh Tpk · Structure no. 7829507

Built
1993
32 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
258 ft
4 main spans
Daily traffic
2,286
2018 count
Owner
Toll Authority
State Toll Authority

About this bridge

EB Tpk Exit 216 Rp over I-80 Ohio Turnpike is a steel continuous stringer/multi-beam or girder carrying EB Tpk Exit 216 Rp over I-80 Ohio Turnpike in Trumbull County, Ohio. It was built in 1993, so it is 32 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,286 vehicles a day, roughly 3% of them trucks, projected to reach 46,787 by 2038. The structure is 258 ft (78.6 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesEB Tpk Exit 216 Rp
CrossesI-80 Ohio Turnpike
LocationEB on Ramp Oh Tpk
RouteInterstate 80K
StateOhio
Coordinates41.13759, -80.87134
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating32.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length258 ft (78.6 m)
Longest span72 ft (21.9 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,286 (2018)
Projected traffic46,787 by 2038
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB Tpk Exit 216 Rp over I-80 Ohio Turnpike built?

It was built in 1993, making it 32 years old in 2025.

What condition is EB Tpk Exit 216 Rp over I-80 Ohio Turnpike in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does EB Tpk Exit 216 Rp over I-80 Ohio Turnpike carry?

About 2,286 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is EB Tpk Exit 216 Rp over I-80 Ohio Turnpike?

The structure is 258 ft (78.6 m) long with a longest span of 72 ft (21.9 m) and a deck 32 ft wide.

Who owns EB Tpk Exit 216 Rp over I-80 Ohio Turnpike?

It is owned by the State Toll Authority.