US Bridges

Tpk Exit 209 Ramp over SR 5

Fair

Trumbull County, Ohio · 0.4MI East of Exit 14 · Structure no. 7800061

Built
1954
71 years old, rebuilt 1993
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
188 ft
4 main spans
Daily traffic
2,700
2019 count
Owner
Toll Authority
State Toll Authority

About this bridge

Tpk Exit 209 Ramp over SR 5 is a steel continuous stringer/multi-beam or girder carrying Tpk Exit 209 Ramp over SR 5 in Trumbull County, Ohio. It was built in 1954 and reconstructed in 1993, so it is 71 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,700 vehicles a day, roughly 8% of them trucks, projected to reach 15,809 by 2039. The structure is 188 ft (57.3 m) long and 33 ft wide.

CarriesTpk Exit 209 Ramp
CrossesSR 5
Location0.4MI East of Exit 14
RouteState Highway 5
StateOhio
Coordinates41.21326, -80.95238
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length188 ft (57.3 m)
Longest span66 ft (20.1 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,700 (2019)
Projected traffic15,809 by 2039
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Tpk Exit 209 Ramp over SR 5 built?

It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1993.

What condition is Tpk Exit 209 Ramp over SR 5 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Tpk Exit 209 Ramp over SR 5 carry?

About 2,700 vehicles per day (2019 count), of which roughly 8% are trucks.

How long is Tpk Exit 209 Ramp over SR 5?

The structure is 188 ft (57.3 m) long with a longest span of 66 ft (20.1 m) and a deck 33 ft wide.

Who owns Tpk Exit 209 Ramp over SR 5?

It is owned by the State Toll Authority.