US Bridges

Seiberling Way over Haley Ditch (243)

Good

Summit County, Ohio · 330 Ft W of Massillon · Structure no. 7761112

Built
2013
12 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete
Length
34 ft
1 main span
Daily traffic
6,602
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Seiberling Way over Haley Ditch (243) is a concrete culvert carrying Seiberling Way over Haley Ditch (243) in Summit County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,602 vehicles a day, roughly 5% of them trucks, projected to reach 9,164 by 2035. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSeiberling Way
CrossesHaley Ditch (243)
Location330 Ft W of Massillon
RouteCity Street 5666
StateOhio
Coordinates41.05432, -81.46396
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating63.9 US tons
Inventory rating50.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,602 (2015)
Projected traffic9,164 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Seiberling Way over Haley Ditch (243) built?

It was built in 2013, making it 12 years old in 2025.

What condition is Seiberling Way over Haley Ditch (243) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Seiberling Way over Haley Ditch (243) carry?

About 6,602 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Seiberling Way over Haley Ditch (243)?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m).

Who owns Seiberling Way over Haley Ditch (243)?

It is owned by the City or Municipal Highway Agency.