N Portage Path RD over Cuyahoga River
GoodSummit County, Ohio · 1150 Ft N of Merriman RD · Structure no. 7730500
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 218 ft
- 3 main spans
- Daily traffic
- 2,503
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
N Portage Path RD over Cuyahoga River is a prestressed concrete continuous stringer/multi-beam or girder carrying N Portage Path RD over Cuyahoga River in Summit County, Ohio. It was built in 2003, so it is 22 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,503 vehicles a day, roughly 3% of them trucks, projected to reach 3,474 by 2038. The structure is 218 ft (66.3 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Portage Path RD over Cuyahoga River built?
It was built in 2003, making it 22 years old in 2025.
What condition is N Portage Path RD over Cuyahoga River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does N Portage Path RD over Cuyahoga River carry?
About 2,503 vehicles per day (2018 count), of which roughly 3% are trucks.
How long is N Portage Path RD over Cuyahoga River?
The structure is 218 ft (66.3 m) long with a longest span of 75 ft (22.8 m) and a deck 34 ft wide.
Who owns N Portage Path RD over Cuyahoga River?
It is owned by the County Highway Agency.