US Bridges

SR 91 over I80 Ohio Tpk

Fair

Summit County, Ohio · 2.9MI East of Exit 12 · Structure no. 7729863

Built
1954
71 years old, rebuilt 1983
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
204 ft
4 main spans
Daily traffic
12,960
2015 count
Owner
Toll Authority
State Toll Authority

About this bridge

SR 91 over I80 Ohio Tpk is a steel continuous stringer/multi-beam or girder carrying SR 91 over I80 Ohio Tpk in Summit County, Ohio. It was built in 1954 and reconstructed in 1983, so it is 71 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,960 vehicles a day, roughly 7% of them trucks, projected to reach 48,204 by 2035. The structure is 204 ft (62.2 m) long and 65 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 91
CrossesI80 Ohio Tpk
Location2.9MI East of Exit 12
RouteState Highway 91
StateOhio
Coordinates41.25435, -81.44044
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating42.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length204 ft (62.2 m)
Longest span66 ft (20.1 m)
Deck width65 ft (19.9 m)
Roadway width62 ft (19 m)
Vertical clearance over deck25 ft (7.6 m)

Traffic and service

Average daily traffic12,960 (2015)
Projected traffic48,204 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 91 over I80 Ohio Tpk built?

It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1983.

What condition is SR 91 over I80 Ohio Tpk in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does SR 91 over I80 Ohio Tpk carry?

About 12,960 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SR 91 over I80 Ohio Tpk?

The structure is 204 ft (62.2 m) long with a longest span of 66 ft (20.1 m) and a deck 65 ft wide.

Who owns SR 91 over I80 Ohio Tpk?

It is owned by the State Toll Authority.