IR271 NB over I80 Oh Tpk WB
FairSummit County, Ohio · JCT of IR80WB & IR271 NB · Structure no. 7729596
- Built
- 1971
- 54 years old, rebuilt 1999
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 215 ft
- 3 main spans
- Daily traffic
- 17,514
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
IR271 NB over I80 Oh Tpk WB is a steel continuous stringer/multi-beam or girder carrying IR271 NB over I80 Oh Tpk WB in Summit County, Ohio. It was built in 1971 and reconstructed in 1999, so it is 54 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,514 vehicles a day, roughly 16% of them trucks, projected to reach 16,073 by 2030. The structure is 215 ft (65.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IR271 NB over I80 Oh Tpk WB built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 1999.
What condition is IR271 NB over I80 Oh Tpk WB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does IR271 NB over I80 Oh Tpk WB carry?
About 17,514 vehicles per day (2010 count), of which roughly 16% are trucks.
How long is IR271 NB over I80 Oh Tpk WB?
The structure is 215 ft (65.4 m) long with a longest span of 91 ft (27.7 m) and a deck 42 ft wide.
Who owns IR271 NB over I80 Oh Tpk WB?
It is owned by the State Highway Agency.