US Bridges

IR271 NB over I80 Oh Tpk WB

Fair

Summit County, Ohio · JCT of IR80WB & IR271 NB · Structure no. 7729596

Built
1971
54 years old, rebuilt 1999
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
215 ft
3 main spans
Daily traffic
17,514
2010 count
Owner
State
State Highway Agency

About this bridge

IR271 NB over I80 Oh Tpk WB is a steel continuous stringer/multi-beam or girder carrying IR271 NB over I80 Oh Tpk WB in Summit County, Ohio. It was built in 1971 and reconstructed in 1999, so it is 54 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,514 vehicles a day, roughly 16% of them trucks, projected to reach 16,073 by 2030. The structure is 215 ft (65.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIR271 NB
CrossesI80 Oh Tpk WB
LocationJCT of IR80WB & IR271 NB
RouteInterstate 271
StateOhio
Coordinates41.25275, -81.5857
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2025
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating38.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length215 ft (65.4 m)
Longest span91 ft (27.7 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,514 (2010)
Projected traffic16,073 by 2030
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IR271 NB over I80 Oh Tpk WB built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 1999.

What condition is IR271 NB over I80 Oh Tpk WB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does IR271 NB over I80 Oh Tpk WB carry?

About 17,514 vehicles per day (2010 count), of which roughly 16% are trucks.

How long is IR271 NB over I80 Oh Tpk WB?

The structure is 215 ft (65.4 m) long with a longest span of 91 ft (27.7 m) and a deck 42 ft wide.

Who owns IR271 NB over I80 Oh Tpk WB?

It is owned by the State Highway Agency.