US Bridges

SR 619 over Br Tuscarawas River

Good

Summit County, Ohio · 1.98 MI E of SR 241 · Structure no. 7711174

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Frame
Concrete
Length
28 ft
1 main span
Daily traffic
7,385
2015 count
Owner
State
State Highway Agency

About this bridge

SR 619 over Br Tuscarawas River is a concrete frame carrying SR 619 over Br Tuscarawas River in Summit County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,385 vehicles a day, roughly 5% of them trucks, projected to reach 10,250 by 2035. The structure is 28 ft (8.5 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 619
CrossesBr Tuscarawas River
Location1.98 MI E of SR 241
RouteState Highway 619
StateOhio
Coordinates40.97614, -81.42621
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45.7 US tons
Inventory rating35.1 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length28 ft (8.5 m)
Longest span28 ft (8.5 m)
Deck width47 ft (14.4 m)
Roadway width45 ft (13.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,385 (2015)
Projected traffic10,250 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 619 over Br Tuscarawas River built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR 619 over Br Tuscarawas River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SR 619 over Br Tuscarawas River carry?

About 7,385 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is SR 619 over Br Tuscarawas River?

The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m) and a deck 47 ft wide.

Who owns SR 619 over Br Tuscarawas River?

It is owned by the State Highway Agency.