US Bridges

Bailey Road CR 610 over Over SR 8

Fair

Summit County, Ohio · 3.40 MI N of SR 261 · Structure no. 7710828

Built
1974
51 years old, rebuilt 1991
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
210 ft
3 main spans
Daily traffic
7,763
2015 count
Owner
State
State Highway Agency

About this bridge

Bailey Road CR 610 over Over SR 8 is a steel continuous stringer/multi-beam or girder carrying Bailey Road CR 610 over Over SR 8 in Summit County, Ohio. It was built in 1974 and reconstructed in 1991, so it is 51 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,763 vehicles a day, roughly 5% of them trucks, projected to reach 101,113 by 2035. The structure is 210 ft (64 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBailey Road CR 610
CrossesOver SR 8
Location3.40 MI N of SR 261
RouteCounty Highway 5412
StateOhio
Coordinates41.14644, -81.4751
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating46.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length210 ft (64 m)
Longest span74 ft (22.6 m)
Deck width42 ft (12.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,763 (2015)
Projected traffic101,113 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bailey Road CR 610 over Over SR 8 built?

It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1991.

What condition is Bailey Road CR 610 over Over SR 8 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Bailey Road CR 610 over Over SR 8 carry?

About 7,763 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Bailey Road CR 610 over Over SR 8?

The structure is 210 ft (64 m) long with a longest span of 74 ft (22.6 m) and a deck 42 ft wide.

Who owns Bailey Road CR 610 over Over SR 8?

It is owned by the State Highway Agency.