US Bridges

I.R. 480 over Over Sum-Sr 91-19.18

Fair

Summit County, Ohio · JCT of Ir 480 and SR 91 · Structure no. 7710380

Built
1965
60 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
221 ft
4 main spans
Daily traffic
18,513
2015 count
Owner
State
State Highway Agency

About this bridge

I.R. 480 over Over Sum-Sr 91-19.18 is a steel continuous stringer/multi-beam or girder carrying I.R. 480 over Over Sum-Sr 91-19.18 in Summit County, Ohio. It was built in 1965, so it is 60 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,513 vehicles a day, roughly 12% of them trucks, projected to reach 25,696 by 2035. The structure is 221 ft (67.4 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI.R. 480
CrossesOver Sum-Sr 91-19.18
LocationJCT of Ir 480 and SR 91
RouteInterstate 480
StateOhio
Coordinates41.30577, -81.44058
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length221 ft (67.4 m)
Longest span70 ft (21.3 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,513 (2015)
Projected traffic25,696 by 2035
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I.R. 480 over Over Sum-Sr 91-19.18 built?

It was built in 1965, making it 60 years old in 2025.

What condition is I.R. 480 over Over Sum-Sr 91-19.18 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does I.R. 480 over Over Sum-Sr 91-19.18 carry?

About 18,513 vehicles per day (2015 count), of which roughly 12% are trucks.

How long is I.R. 480 over Over Sum-Sr 91-19.18?

The structure is 221 ft (67.4 m) long with a longest span of 70 ft (21.3 m) and a deck 44 ft wide.

Who owns I.R. 480 over Over Sum-Sr 91-19.18?

It is owned by the State Highway Agency.