US Bridges

SR 303 over Over Bike & Hike Trail

Good

Summit County, Ohio · 0.22 MI W of SR 8 · Structure no. 7709994

Built
1965
60 years old, rebuilt 2016
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
185 ft
3 main spans
Daily traffic
9,700
2015 count
Owner
State
State Highway Agency

About this bridge

SR 303 over Over Bike & Hike Trail is a steel continuous stringer/multi-beam or girder carrying SR 303 over Over Bike & Hike Trail in Summit County, Ohio. It was built in 1965 and reconstructed in 2016, so it is 60 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,700 vehicles a day, roughly 10% of them trucks, projected to reach 13,464 by 2035. The structure is 185 ft (56.4 m) long and 46 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 303
CrossesOver Bike & Hike Trail
Location0.22 MI W of SR 8
RouteState Highway 303
StateOhio
Coordinates41.2321, -81.49476
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating36.8 US tons
Inventory rating28.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadH 15
Structure length185 ft (56.4 m)
Longest span66 ft (20.1 m)
Deck width46 ft (14 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,700 (2015)
Projected traffic13,464 by 2035
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 303 over Over Bike & Hike Trail built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2016.

What condition is SR 303 over Over Bike & Hike Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR 303 over Over Bike & Hike Trail carry?

About 9,700 vehicles per day (2015 count), of which roughly 10% are trucks.

How long is SR 303 over Over Bike & Hike Trail?

The structure is 185 ft (56.4 m) long with a longest span of 66 ft (20.1 m) and a deck 46 ft wide.

Who owns SR 303 over Over Bike & Hike Trail?

It is owned by the State Highway Agency.