US Bridges

I-76 EB Off Ramp over Ramp E-8 over Ramp E-6

Good

Summit County, Ohio · 0.81 MI E of SR 8 · Structure no. 7706251

Built
1993
32 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
95 ft
1 main span
Daily traffic
84,580
2010 count
Owner
State
State Highway Agency

About this bridge

I-76 EB Off Ramp over Ramp E-8 over Ramp E-6 is a steel stringer/multi-beam or girder carrying I-76 EB Off Ramp over Ramp E-8 over Ramp E-6 in Summit County, Ohio. It was built in 1993, so it is 32 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 84,580 vehicles a day, roughly 17% of them trucks, projected to reach 117,397 by 2030. The structure is 95 ft (29 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-76 EB Off Ramp
CrossesRamp E-8 over Ramp E-6
Location0.81 MI E of SR 8
RouteInterstate 76
StateOhio
Coordinates41.06314, -81.48995
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81 US tons
Inventory rating62.5 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length95 ft (29 m)
Longest span81 ft (24.7 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic84,580 (2010)
Projected traffic117,397 by 2030
Trucks17%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-76 EB Off Ramp over Ramp E-8 over Ramp E-6 built?

It was built in 1993, making it 32 years old in 2025.

What condition is I-76 EB Off Ramp over Ramp E-8 over Ramp E-6 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does I-76 EB Off Ramp over Ramp E-8 over Ramp E-6 carry?

About 84,580 vehicles per day (2010 count), of which roughly 17% are trucks.

How long is I-76 EB Off Ramp over Ramp E-8 over Ramp E-6?

The structure is 95 ft (29 m) long with a longest span of 81 ft (24.7 m) and a deck 31 ft wide.

Who owns I-76 EB Off Ramp over Ramp E-8 over Ramp E-6?

It is owned by the State Highway Agency.