US Bridges

I.R. 76 over Over Wooster-East Ave

Good

Summit County, Ohio · JCT SR 619 and Ir 76 · Structure no. 7705493

Built
2021
4 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
130 ft
1 main span
Daily traffic
77,400
2020 count
Owner
State
State Highway Agency

About this bridge

I.R. 76 over Over Wooster-East Ave is a steel stringer/multi-beam or girder carrying I.R. 76 over Over Wooster-East Ave in Summit County, Ohio. It was built in 2021, so it is 4 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 77,400 vehicles a day, roughly 15% of them trucks, projected to reach 98,004 by 2040. The structure is 130 ft (39.7 m) long and 156 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI.R. 76
CrossesOver Wooster-East Ave
LocationJCT SR 619 and Ir 76
RouteInterstate 76
StateOhio
Coordinates41.03567, -81.57858
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating57.1 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length130 ft (39.7 m)
Longest span129 ft (39.2 m)
Deck width156 ft (47.5 m)
Roadway width153 ft (46.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic77,400 (2020)
Projected traffic98,004 by 2040
Trucks15%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$25.6 million (2018 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I.R. 76 over Over Wooster-East Ave built?

It was built in 2021, making it 4 years old in 2025.

What condition is I.R. 76 over Over Wooster-East Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does I.R. 76 over Over Wooster-East Ave carry?

About 77,400 vehicles per day (2020 count), of which roughly 15% are trucks.

How long is I.R. 76 over Over Wooster-East Ave?

The structure is 130 ft (39.7 m) long with a longest span of 129 ft (39.2 m) and a deck 156 ft wide.

Who owns I.R. 76 over Over Wooster-East Ave?

It is owned by the State Highway Agency.