US Bridges

Ir 76 over Over Barber RD CR-53

Good

Summit County, Ohio · 1.63 MI W of SR 619 · Structure no. 7705132

Built
2017
8 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
107 ft
1 main span
Daily traffic
74,650
2016 count
Owner
State
State Highway Agency

About this bridge

Ir 76 over Over Barber RD CR-53 is a prestressed concrete stringer/multi-beam or girder carrying Ir 76 over Over Barber RD CR-53 in Summit County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 74,650 vehicles a day, roughly 13% of them trucks, projected to reach 91,250 by 2036. The structure is 107 ft (32.5 m) long and 155 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIr 76
CrossesOver Barber RD CR-53
Location1.63 MI W of SR 619
RouteInterstate 76
StateOhio
Coordinates41.04047, -81.60896
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.4 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length107 ft (32.5 m)
Longest span103 ft (31.4 m)
Deck width155 ft (47.2 m)
Roadway width151 ft (46 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic74,650 (2016)
Projected traffic91,250 by 2036
Trucks13%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$804.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 76 over Over Barber RD CR-53 built?

It was built in 2017, making it 8 years old in 2025.

What condition is Ir 76 over Over Barber RD CR-53 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Ir 76 over Over Barber RD CR-53 carry?

About 74,650 vehicles per day (2016 count), of which roughly 13% are trucks.

How long is Ir 76 over Over Barber RD CR-53?

The structure is 107 ft (32.5 m) long with a longest span of 103 ft (31.4 m) and a deck 155 ft wide.

Who owns Ir 76 over Over Barber RD CR-53?

It is owned by the State Highway Agency.