I.R. 76 over Sum-Sr 21-3.56
FairSummit County, Ohio · JCT of Ir 76 and SR 21 · Structure no. 7705018
- Built
- 1958
- 67 years old, rebuilt 1993
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 259 ft
- 4 main spans
- Daily traffic
- 43,339
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I.R. 76 over Sum-Sr 21-3.56 is a steel continuous stringer/multi-beam or girder carrying I.R. 76 over Sum-Sr 21-3.56 in Summit County, Ohio. It was built in 1958 and reconstructed in 1993, so it is 67 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 43,339 vehicles a day, roughly 15% of them trucks, projected to reach 60,155 by 2035. The structure is 259 ft (78.9 m) long and 135 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I.R. 76 over Sum-Sr 21-3.56 built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1993.
What condition is I.R. 76 over Sum-Sr 21-3.56 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does I.R. 76 over Sum-Sr 21-3.56 carry?
About 43,339 vehicles per day (2015 count), of which roughly 15% are trucks.
How long is I.R. 76 over Sum-Sr 21-3.56?
The structure is 259 ft (78.9 m) long with a longest span of 75 ft (22.9 m) and a deck 135 ft wide.
Who owns I.R. 76 over Sum-Sr 21-3.56?
It is owned by the State Highway Agency.