US Bridges

I-76 over Over Lakeshore Blvd CR60

Good

Summit County, Ohio · 0.55 MI E of SR 93 · Structure no. 7703392

Built
1963
62 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
171 ft
3 main spans
Daily traffic
92,927
2015 count
Owner
State
State Highway Agency

About this bridge

I-76 over Over Lakeshore Blvd CR60 is a steel continuous stringer/multi-beam or girder carrying I-76 over Over Lakeshore Blvd CR60 in Summit County, Ohio. It was built in 1963, so it is 62 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 92,927 vehicles a day, roughly 8% of them trucks, projected to reach 128,983 by 2035. The structure is 171 ft (52.1 m) long and 118 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-76
CrossesOver Lakeshore Blvd CR60
Location0.55 MI E of SR 93
RouteInterstate 76
StateOhio
Coordinates41.06205, -81.54077
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length171 ft (52.1 m)
Longest span67 ft (20.4 m)
Deck width118 ft (36.1 m)
Roadway width114 ft (34.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic92,927 (2015)
Projected traffic128,983 by 2035
Trucks8%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-76 over Over Lakeshore Blvd CR60 built?

It was built in 1963, making it 62 years old in 2025.

What condition is I-76 over Over Lakeshore Blvd CR60 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does I-76 over Over Lakeshore Blvd CR60 carry?

About 92,927 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is I-76 over Over Lakeshore Blvd CR60?

The structure is 171 ft (52.1 m) long with a longest span of 67 ft (20.4 m) and a deck 118 ft wide.

Who owns I-76 over Over Lakeshore Blvd CR60?

It is owned by the State Highway Agency.