US Bridges

SB I77 to EB US224 over NB Ir 77

Good

Summit County, Ohio · 0.15 MI S of US 224 · Structure no. 7702648

Built
2023
2 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
348 ft
3 main spans
Daily traffic
6,030
2020 count
Owner
State
State Highway Agency

About this bridge

SB I77 to EB US224 over NB Ir 77 is a steel continuous stringer/multi-beam or girder carrying SB I77 to EB US224 over NB Ir 77 in Summit County, Ohio. It was built in 2023, so it is 2 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,030 vehicles a day, roughly 4% of them trucks, projected to reach 6,240 by 2040. The structure is 348 ft (106 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSB I77 to EB US224
CrossesNB Ir 77
Location0.15 MI S of US 224
RouteInterstate 77
StateOhio
Coordinates41.02378, -81.49937
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating72.5 US tons
Inventory rating55.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length348 ft (106 m)
Longest span166 ft (50.7 m)
Deck width29 ft (8.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,030 (2020)
Projected traffic6,240 by 2040
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SB I77 to EB US224 over NB Ir 77 built?

It was built in 2023, making it 2 years old in 2025.

What condition is SB I77 to EB US224 over NB Ir 77 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SB I77 to EB US224 over NB Ir 77 carry?

About 6,030 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is SB I77 to EB US224 over NB Ir 77?

The structure is 348 ft (106 m) long with a longest span of 166 ft (50.7 m) and a deck 29 ft wide.

Who owns SB I77 to EB US224 over NB Ir 77?

It is owned by the State Highway Agency.