US Bridges

SR 21 over SR 21 NB over SR162

Good

Summit County, Ohio · 2.54 MI S of SR 18 · Structure no. 7701691

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
84 ft
1 main span
Daily traffic
16,853
2015 count
Owner
State
State Highway Agency

About this bridge

SR 21 over SR 21 NB over SR162 is a steel stringer/multi-beam or girder carrying SR 21 over SR 21 NB over SR162 in Summit County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,853 vehicles a day, roughly 7% of them trucks, projected to reach 23,392 by 2035. The structure is 84 ft (25.6 m) long and 55 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 21
CrossesSR 21 NB over SR162
Location2.54 MI S of SR 18
RouteState Highway 21
StateOhio
Coordinates41.09922, -81.6572
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating49.6 US tons
Inventory rating38.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length84 ft (25.6 m)
Longest span84 ft (25.6 m)
Deck width55 ft (16.8 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,853 (2015)
Projected traffic23,392 by 2035
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 21 over SR 21 NB over SR162 built?

It was built in 2006, making it 19 years old in 2025.

What condition is SR 21 over SR 21 NB over SR162 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does SR 21 over SR 21 NB over SR162 carry?

About 16,853 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SR 21 over SR 21 NB over SR162?

The structure is 84 ft (25.6 m) long with a longest span of 84 ft (25.6 m) and a deck 55 ft wide.

Who owns SR 21 over SR 21 NB over SR162?

It is owned by the State Highway Agency.