US Bridges

Greenwich Road over SR21

Good

Summit County, Ohio · 2.31 MI N of SR 585 · Structure no. 7701292

Built
1957
68 years old, rebuilt 2007
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
203 ft
4 main spans
Daily traffic
6,028
2015 count
Owner
State
State Highway Agency

About this bridge

Greenwich Road over SR21 is a steel continuous stringer/multi-beam or girder carrying Greenwich Road over SR21 in Summit County, Ohio. It was built in 1957 and reconstructed in 2007, so it is 68 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,028 vehicles a day, roughly 7% of them trucks, projected to reach 45,517 by 2035. The structure is 203 ft (61.9 m) long and 35 ft wide.

CarriesGreenwich Road
CrossesSR21
Location2.31 MI N of SR 585
RouteCity Street 5630
StateOhio
Coordinates41.02569, -81.66518
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length203 ft (61.9 m)
Longest span63 ft (19.1 m)
Deck width35 ft (10.7 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,028 (2015)
Projected traffic45,517 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Greenwich Road over SR21 built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2007.

What condition is Greenwich Road over SR21 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Greenwich Road over SR21 carry?

About 6,028 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Greenwich Road over SR21?

The structure is 203 ft (61.9 m) long with a longest span of 63 ft (19.1 m) and a deck 35 ft wide.

Who owns Greenwich Road over SR21?

It is owned by the State Highway Agency.