SR 8 over Relief Sidehill Struct
FairSummit County, Ohio · 0.60 MI S of SR 59 · Structure no. 7700733
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Concrete Continuous
- Length
- 358 ft
- 12 main spans
- Daily traffic
- 7,800
- 1990 count
- Owner
- State
- State Highway Agency
About this bridge
SR 8 over Relief Sidehill Struct is a concrete continuous slab carrying SR 8 over Relief Sidehill Struct in Summit County, Ohio. It was built in 1975, so it is 50 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,800 vehicles a day, roughly 1% of them trucks, projected to reach 10,826 by 2010. The structure is 358 ft (109.1 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 8 over Relief Sidehill Struct built?
It was built in 1975, making it 50 years old in 2025.
What condition is SR 8 over Relief Sidehill Struct in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR 8 over Relief Sidehill Struct carry?
About 7,800 vehicles per day (1990 count), of which roughly 1% are trucks.
How long is SR 8 over Relief Sidehill Struct?
The structure is 358 ft (109.1 m) long with a longest span of 33 ft (10.1 m) and a deck 30 ft wide.
Who owns SR 8 over Relief Sidehill Struct?
It is owned by the State Highway Agency.