Graham Road CR 29 over Over SR 8
GoodSummit County, Ohio · 1.50 MI N of SR 59 · Structure no. 7700687
- Built
- 1974
- 51 years old, rebuilt 1991
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 273 ft
- 4 main spans
- Daily traffic
- 25,340
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Graham Road CR 29 over Over SR 8 is a steel continuous stringer/multi-beam or girder carrying Graham Road CR 29 over Over SR 8 in Summit County, Ohio. It was built in 1974 and reconstructed in 1991, so it is 51 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,340 vehicles a day, roughly 11% of them trucks, projected to reach 77,985 by 2035. The structure is 273 ft (83.2 m) long and 61 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Graham Road CR 29 over Over SR 8 built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1991.
What condition is Graham Road CR 29 over Over SR 8 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Graham Road CR 29 over Over SR 8 carry?
About 25,340 vehicles per day (2015 count), of which roughly 11% are trucks.
How long is Graham Road CR 29 over Over SR 8?
The structure is 273 ft (83.2 m) long with a longest span of 84 ft (25.6 m) and a deck 61 ft wide.
Who owns Graham Road CR 29 over Over SR 8?
It is owned by the State Highway Agency.