US Bridges

SA2119 Grovedell over Indian Run

Good

Stark County, Ohio · 0.5 Mi. W. of SR43 · Structure no. 7636326

Built
2020
5 years old
Condition
Good
inspected October 2024
Type
Frame
Concrete
Length
34 ft
1 main span
Daily traffic
300
2015 count
Owner
County
County Highway Agency

About this bridge

SA2119 Grovedell over Indian Run is a concrete frame carrying SA2119 Grovedell over Indian Run in Stark County, Ohio. It was built in 2020, so it is 5 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, roughly 7% of them trucks, projected to reach 450 by 2035. The structure is 34 ft (10.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSA2119 Grovedell
CrossesIndian Run
Location0.5 Mi. W. of SR43
RouteCounty Highway T0159
StateOhio
Coordinates40.67313, -81.26984
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating39.2 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckOther
Main spans1
Design loadHL 93
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2015)
Projected traffic450 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SA2119 Grovedell over Indian Run built?

It was built in 2020, making it 5 years old in 2025.

What condition is SA2119 Grovedell over Indian Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does SA2119 Grovedell over Indian Run carry?

About 300 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SA2119 Grovedell over Indian Run?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 28 ft wide.

Who owns SA2119 Grovedell over Indian Run?

It is owned by the County Highway Agency.