US Bridges

PE3393 Sterilite over W&le Railroad

Good

Stark County, Ohio · 0.6 Mi. S. of CR511 · Structure no. 7636172

Built
2012
13 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
242 ft
3 main spans
Daily traffic
10
2012 count
Owner
County
County Highway Agency

About this bridge

PE3393 Sterilite over W&le Railroad is a steel continuous stringer/multi-beam or girder carrying PE3393 Sterilite over W&le Railroad in Stark County, Ohio. It was built in 2012, so it is 13 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 20% of them trucks, projected to reach 14 by 2032. The structure is 242 ft (73.8 m) long and 43 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesPE3393 Sterilite
CrossesW&le Railroad
Location0.6 Mi. S. of CR511
RouteCity Street 4236
StateOhio
Coordinates40.73841, -81.50245
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating62.8 US tons
Inventory rating48.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length242 ft (73.8 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2012)
Projected traffic14 by 2032
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad and waterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was PE3393 Sterilite over W&le Railroad built?

It was built in 2012, making it 13 years old in 2025.

What condition is PE3393 Sterilite over W&le Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does PE3393 Sterilite over W&le Railroad carry?

About 10 vehicles per day (2012 count), of which roughly 20% are trucks.

How long is PE3393 Sterilite over W&le Railroad?

The structure is 242 ft (73.8 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns PE3393 Sterilite over W&le Railroad?

It is owned by the County Highway Agency.