BE0603 Wooster over Tuscarawas River
GoodStark County, Ohio · 1.0 Mi. E. of CR333 · Structure no. 7635230
- Built
- 1985
- 40 years old, rebuilt 2010
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 212 ft
- 3 main spans
- Daily traffic
- 3,040
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
BE0603 Wooster over Tuscarawas River is a prestressed concrete continuous box beam or girders - multiple carrying BE0603 Wooster over Tuscarawas River in Stark County, Ohio. It was built in 1985 and reconstructed in 2010, so it is 40 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,040 vehicles a day, roughly 5% of them trucks, projected to reach 4,220 by 2035. The structure is 212 ft (64.6 m) long and 37 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was BE0603 Wooster over Tuscarawas River built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2010.
What condition is BE0603 Wooster over Tuscarawas River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does BE0603 Wooster over Tuscarawas River carry?
About 3,040 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is BE0603 Wooster over Tuscarawas River?
The structure is 212 ft (64.6 m) long with a longest span of 69 ft (21 m) and a deck 37 ft wide.
Who owns BE0603 Wooster over Tuscarawas River?
It is owned by the County Highway Agency.